ROYPOW agrees second Indonesian manufacturing project

ROYPOW’s October 28 agreement covers a proposed Batam manufacturing project. Buyers should verify the actual production site and supply terms for each offered model.

AI editorial illustration of factory planning sheets overlooking a generic tropical industrial park
AI-generated editorial concept; not the proposed ROYPOW facility, a site survey or evidence of production readiness.

ROYPOW has announced an investment agreement for another manufacturing project in Batam, Indonesia. For forklift-power buyers, this is a supplier-footprint development to monitor. It does not establish that a particular battery model is already being made at the proposed site or available for delivery.

What the announcement establishes

The company's October 28, 2026 statement records an agreement with TUNAS representatives for a project at TUNAS Prima Industrial Park. ROYPOW describes an approximately 36,000-square-metre project intended to manufacture its “Dark Horse Project” series. It also outlines production-data management and quality traceability through an MES system, alongside plans to develop local supplier relationships.

These are announced plans. The statement does not supply a commissioning date or identify individual forklift-battery models allocated to the proposed factory. Its October date remains the source date; the agreement is not a new signing on the date of this article.

What procurement teams should request

Ask the quoting entity to identify the actual manufacturing location for each offered model, together with the legal seller and the organisation responsible for warranty support. A group-level factory announcement should not replace these details in a purchase contract. Existing supplier relationships also need a clear explanation of whether anything changes for an order already placed.

For a proposed battery purchase, keep the model, voltage, capacity, enclosure dimensions, connector and charger requirements in the same quotation record. Request the applicable documentation for the exact offered configuration. Do not treat a production-location announcement as evidence of certification, vehicle compatibility or a change in product specifications.

If a quotation depends on the future site, request the milestones behind its delivery estimate, the alternative supply arrangement if those milestones move, and the party providing local service. These are verification questions, rather than a prediction that the project will be delayed.

Evidence boundary

ForkliftIQ has not inspected the proposed facility or independently verified its readiness. No output forecast is converted here into available battery supply. The image is a generic planning illustration, not a factory photograph. Use the comparison brief to record offered configurations and the sourcing workspace to organise supplier questions.

Manufacturer source reviewed · ROYPOW · 28 October 2026:
https://www.roypow.com/news/roypow-signs-agreement-for-second-overseas-manufacturing-base-in-indonesia/

Prepare the fleet and service requirement.

Compare suppliers against the same duty, configuration, service and documentation brief.

Prepare a Sourcing Need