
Fujian SOCMA Machinery Manufacture Co., Ltd.
Long-load side handling and related heavy machinery. Identify the exact offer before assessing suitability.
Editorial category illustration; not a company factory or delivered-model photograph.
Continue from the category into a documented model.
Use a model page to translate published claims into site measurements, configuration evidence, parts identity and quotation questions.
Open the complete model libraryCompany and source context
SOCMA’s company site places its business in Quanzhou, Fujian, and describes heavy-handling, off-road, telescopic, port and electric equipment. The reviewed side-loader page provides a specific FDS 25-tonne reference. These are company-published research leads, not an independent factory audit.
Location and contracting identity
The source gives Taiwanese Investment Area, Quanzhou, Fujian, China. Confirm the contracting entity, current manufacturing address and the proposed delivery location in writing.
Equipment enquiry focus
For a side-loader enquiry, provide bundle geometry, supporting points, storage layout, deck support, lateral pickup space and the complete travel route. Ask for a production model code corresponding to the FDS reference, a controlled drawing and the capacity basis for the actual load. Do not transfer specifications between the wider product range and a particular rated-load class.
What the record establishes
A company website gives an identifiable publisher, a product discovery route and a place to start a written enquiry. It does not prove current stock, ownership of every illustrated machine, exclusive distribution, measured performance or approval of a buyer’s application. ForkliftIQ has not inspected the factory or audited the transaction. Preserve the difference between a supplier’s published statement and a controlled document for the offered equipment.
Use the company name, website, full model code and quotation reference together. Ask who is the legal seller, who manufactures the equipment and who is responsible for commissioning and service. Brand wording alone can be insufficient when a proposal is delivered through another business or regional channel.
Make the request specific
Send load mass, dimensions, centre of gravity, required lift or reach, working space, route and duty cycle. Explain loading interfaces, supporting points, floor conditions and environmental limits. Include a drawing or photographs where they clarify the requirement. Ask every supplier to answer the same written specification so exclusions and configuration differences are visible.
Request the exact configuration, options, drawing revision, data sheet, instructions and capacity information. A product-family page can describe several machines. Keep the offered model’s values and conditions together instead of selecting the best headline from different versions. Record every unresolved discrepancy and require an identified responsible party to clarify it.
Documents and commercial responsibility
Ask which destination-specific documents apply to the proposed equipment. A general quality-system or certification statement on a company page does not establish compliance of one machine or installation. Require the document identity, applicable model and responsible issuer for the offered configuration. Do not infer approval from a logo, category name or an unverified certificate image.
Identify the seller, Incoterm, delivery place, included options, commissioning scope, document language and acceptance criteria. Request warranty coverage, exclusions, starting event, response route and service responsibility in writing. Published marketing lead times and broad after-sales claims should not be treated as contract commitments.
Parts and lifecycle preparation
Preserve the machine plate, model, serial number, mast or lifting-system identity, attachment details and relevant powertrain records. For a component enquiry, add the original part number, drawing, mounting dimensions, connectors and ports. Ask the responsible supplier to state the catalogue or supersession record used for a replacement; appearance alone does not prove interchangeability.
Define the source of spare parts, inspection information, service documentation and technical support before purchase. Include expected downtime, local support and maintenance access in the comparison. A company’s broad spare-parts statement does not establish availability of a particular model-specific component.
How to use this supplier profile
Use this page to connect company research to a documented equipment enquiry. Compare relevant manufacturers using the same load and site requirement, and retain their dated responses. A directory listing is not a ranking, endorsement, factory certification or promise that a seller can deliver every product mentioned on its website.
ForkliftIQ provides original buyer questions around the identifiable source. Manufacturer statements remain attributed, and the final commercial and engineering review belongs to the responsible supplier and buyer teams. Current capability, legal identity, addresses, documents and the complete offer still require confirmation. No outreach has been sent as part of preparing this record.
Company-controlled sources
Website: https://www.socma-forklift.com/
https://www.socma-forklift.com/about-us
Supplier directory · Model research library · Prepare a sourcing request
Preserve the application review
A long-load proposal should show the relationship between the goods, lifting interface, deck supports and storage arrangement. Ask the supplier to return marked drawings identifying the reviewed assumptions and exceptions. Keep load preparation, restraint and movement instructions with the offer. Establish who reviews any later change to the goods or supporting fixture. A change in bundle length, supporting points or centre of gravity can require a new review even where nominal mass remains unchanged.