XCMG Special Construction Machinery supplier profile / Honghu pallet stacking
Supplier-published product familyHonghu lithium stacker reference
A mast-equipped warehouse stacking reference distinguished from low-lift transport. Confirm the exact mast, pallet support and capacity basis for the proposed machine.
Identify the enquiry scope
- Reference level
- Published family/function; complete SKU and revision not established
- Handling task
- Honghu pallet stacking
- Original source date
- 2026-03-17
- Supply status
- Not verified; request a current written offer
Reviewed 26 October 2026. Original source date: 2026-03-17. No exact model or revision inferred; request current documents.
What the official reference establishes
The Honghu article describes both horizontal pallet movement and higher storage tasks. Its group image contains short- and tall-mast equipment as well as low-lift trucks. The representative presentation here uses the short-mast, tiller-controlled machine at the right of that group, not the separate standing reach-style truck shown elsewhere in the article.
Define the work before choosing a configuration
Measure the pallet underside and rack approach, then state the required placement height and load dimensions. Ask for the offered mast’s closed height, extended height and capacity chart with the proposed forks or attachment. An article’s high-lift example does not establish the residual capacity of an unidentified stacker.
Keep the supply package explicit
Keep the operator arrangement, support-leg geometry, fork dimensions, mast stages and charging equipment as named quotation items. Do not merge different mast versions into one fixed rating. Battery and charger information must belong to the actual offered vehicle; neither a family name nor a similar appearance proves interchangeable parts or configurations.
Questions for the proposed product
Which exact product is proposed?
Request the complete model, configuration, revision and identification documents. Ask which current supplier entity will quote and support that proposal; the historical manufacturer signature is not per-unit factory or contracting evidence.
Which configuration documents are needed?
Request the current datasheet, relevant dimensions, energy package, operating boundaries and project-specific assessment. Keep assumptions and unresolved differences attached to the quotation.
How should the response be compared?
Separate equipment, accessories, delivery, commissioning, documentation and support. Compare responses to the same written requirement. Do not treat the website reference as an offer, inventory record or compatibility approval.
From product research to a comparable request
Prepare a written requirement with the load, load centre, handling height, support dimensions, site interfaces, operating conditions, destination and quantity. Ask each shortlisted supplier to answer the same requirement and identify assumptions or exclusions. Keep the proposed equipment or attachment, accessories, documentation, delivery and support scope visible as separate lines. An equivalent headline capacity does not by itself make two offers comparable.
Sources and evidence boundary
This reference uses XCMG group application articles with the original dates shown above. A historical C-series brochure hosted on group-linked Machmall names this supplier in Chinese and English; that signature is an identity connection, not a current catalogue revision or per-unit manufacturing record. The dedicated supplier website could not be reached. The article and image establish a published family/function, not the complete model, current stock, delivery, authorization, certification, compatibility or an independently tested benefit. Confirm the legal quoting entity and current exact-model documents. No numerical safety, capacity, runtime, charging or efficiency guarantee is adopted. This is procurement preparation, not operating or repair guidance.
https://www.xcmg.com/case/case-detail-11243116.htm
https://www.machmall.com/images/store/357636/item/1636184668%E7%94%B5%E5%8A%A8C%E7%B3%BB%E5%88%97%E5%8F%89%E8%BD%A6%E6%8A%98%E9%A1%B5%E4%B8%AD%E8%8B%B1%E7%89%88.pdf